- Services
- Decommissioning
- Well Abandonment
- Life of Field
- Controlled Flow Excavation
- Project management
- Worldwide partnerships
- Bespoke engineering
- Equipment overhaul and recertification
- Offshore technicians
- JFS complementary services
- Equipment
- Subsea tooling
- Winches
- Marine cranes
- Fluid solutions
- Associated deck equipment
- Controlled Flow Excavation Tools
- Ingersoll Rand
- Man riding winches
- Utility winches
- Hoists
- BOP handling systems
- OEM spare parts
- Ingersoll Rand service centre
- Ingersoll Rand power tools
- About
- Our Values
- Careers
- Apprenticeships
- Global locations
- QHSE (Quality, Health, Safety and Environment)
- Cutting equipment
- Recovery equipment
- Coating removal equipment
- Subsea pumps
- Subsea ancillary equipment
- Torquing and bolting
- Spare parts and consumables
- Subsea drills
- Subsea cleaning powertools
- Subsea breakers
- Positive displacement pumps/HT400
- Centrifugal pumps
- Jetting pumps
- Umbilical reelers and associated equipment
- Air compressors
- Fairleads
- Hydraulic power units (HPUs)
- Launch and recovery systems (LARS) / A-frames
- Overboarding sheaves
- Hot wash unit
- Darren Chapman is promoted to operations manager
- We are pleased to announce two new promotions within James Fisher Offshore
- James Fisher and NMDC Group sign strategic agreement
- Supporting our local community
- Archive
- Supplying pumping equipment to raise the Costa Concordia
- Equipment spreads for Hess South Arne and IVRR
- Supporting Fugro Subsea Services Ltd. with equipment deployment in the North Sea
- Mobilising hydraulic winch package for Technip
- Taqa Harding DSV campaigns
- Dredging for Subsea 7 in the North Sea
- Full back deck provision for Technip IRM campaign
- Subsea 7 - BP West Nile Delta gas development
- Subsea umbilical removal for the Judy platform
- Supporting Bibby Subsea with IRM works
- Pull-in winch package for Technip/Chevron Bangka project
- Supplying hydraulic winch packages for Quad 204 FPSO project
- Installing and commissioning FPSO winch package alongside Bibby Offshore
- Provision of deck and subsea equipment for Hibernia Southern Extension project
- Gryphon Alpha FPSO winch and line monitoring package
- Enabling riser pull-in on the Dunlin Alpha platform
- BP Clair fibre optic installation
- Electrical umbilical pull-in for Callater Field development
- Undertaking preventative winch maintenance for Ensco
- JFO provides bespoke solutions on complex project off the Ivory Coast
- James Fisher Offshore supports Subsea 7 in Gorgon project
- Recovery and reinstallation of Ocean Installer mooring lines
- Nemo Link UXO Investigation
- Lancaster EPS Project
- TechnipFMC Enquest Kraken
- TechnipFMC/Repsol IRM
- Subsea 7 BP Atoll
- Cutting, dredging and recovery demonstration
- Premier Oil Balmoral Abex - Decommissioning
- Safaniya Demolition works
- DeepOcean Ghana, TEN project
- Abrasive Water Jet Cutting Case Study
- Safaniya Jacket Removal
- Seven Kestrel IRM
- Bokor Phase III Redevelopment
- Linear Winch Case Study
- Talos Bulleit
- Well severance UKCS
- *Update* Safaniya Jacket Removal
- Sapura / Chevron Thailand jacket and pipeline removal
- CFE Q1 2021 update
- JFO Life of Field - Riser installation UKCS
- Life of Field update Q2 2021
- Controlled Flow Excavation services for Renewables
- Multistring Conductor Cut and Recovery
- Pipeline cut and recovery, Arabian Gulf
- Jacket Removal, Safaniya, KSA
- Slipover jacket removal from James Fisher Decommissioning
- USA Offshore Wind Farms
- Abrasive cutting trial at National Hyperbaric Centre Aberdeen
- Shore Pull Kingdom of Saudi Arabia
- James Fisher Decommissioning - Gyda jacket decommissioning
- Jacket repair case study
- Installation of flexible risers case study
Pipeline cut and recovery, Arabian Gulf
Scope of Work
Mobilising from our KSA base and delivered by our expert team, James Fisher Decommissioning (JF Decom) have successfully cut and recovered over 2000 metres of subsea pipeline from the Arabian Gulf.
Customer requirement included suitable equipment for the cut and recovery of:
• 36” OD Pipeline, 1” Wall thickness c/w 5” CWC
• 32” OD Pipeline, 0.875” Wall thickness c/w 3” CWC
• 24” Pipeline, 0.875” Wall thickness c/w 3” CWC
• 20” Pipeline, 0.75” Wall thickness c/w 2” CWC
• 10” Pipeline, 0.5” Wall thickness c/w 1”CWC
• 8” Pipeline, 0.875” Wall thickness c/w 0.5”CWC
Scope of Supply
• 2835Te Hydraulic Shear (1333/18)
• Hydraulic Power Pack
• Reeler c/w 150mtr twin line umbilical
• 2 x 20Te Grabs c/w spreader beam
Results and Benefits
JF Decom delivered full continuous operations between the hydraulic shear and the hydraulic 20Te twin grab set-up through utilisation of the same HPU and downline, saving on both valuable deck space and vessel time.
Following successful completion of the workscope, JF Decom has been awarded an additional scope by the customer for further decommissioning work in the Arabian Gulf.
Download pipeline cut and recovery case study (377 KB)