- Services
- Decommissioning
- Well Abandonment
- Life of Field
- Controlled Flow Excavation
- Project management
- Worldwide partnerships
- Bespoke engineering
- Equipment overhaul and recertification
- Offshore technicians
- JFS complementary services
- Equipment
- Subsea tooling
- Winches
- Marine cranes
- Fluid solutions
- Associated deck equipment
- Controlled Flow Excavation Tools
- Ingersoll Rand
- Man riding winches
- Utility winches
- Hoists
- BOP handling systems
- OEM spare parts
- Ingersoll Rand service centre
- Ingersoll Rand power tools
- About
- Our Values
- Careers
- Apprenticeships
- Global locations
- QHSE (Quality, Health, Safety and Environment)
- Cutting equipment
- Recovery equipment
- Coating removal equipment
- Subsea pumps
- Subsea ancillary equipment
- Torquing and bolting
- Spare parts and consumables
- Subsea drills
- Subsea cleaning powertools
- Subsea breakers
- Positive displacement pumps/HT400
- Centrifugal pumps
- Jetting pumps
- Umbilical reelers and associated equipment
- Air compressors
- Fairleads
- Hydraulic power units (HPUs)
- Launch and recovery systems (LARS) / A-frames
- Overboarding sheaves
- Hot wash unit
- James Fisher and NMDC Group sign strategic agreement
- Supporting our local community
- Energy Voice - James Fisher Decommissioning
- James Fisher to address needs of expanding decommissioning market with launch of dedicated business line
- Archive
- Supplying pumping equipment to raise the Costa Concordia
- Equipment spreads for Hess South Arne and IVRR
- Supporting Fugro Subsea Services Ltd. with equipment deployment in the North Sea
- Mobilising hydraulic winch package for Technip
- Taqa Harding DSV campaigns
- Dredging for Subsea 7 in the North Sea
- Full back deck provision for Technip IRM campaign
- Subsea 7 - BP West Nile Delta gas development
- Subsea umbilical removal for the Judy platform
- Supporting Bibby Subsea with IRM works
- Pull-in winch package for Technip/Chevron Bangka project
- Supplying hydraulic winch packages for Quad 204 FPSO project
- Installing and commissioning FPSO winch package alongside Bibby Offshore
- Provision of deck and subsea equipment for Hibernia Southern Extension project
- Gryphon Alpha FPSO winch and line monitoring package
- Enabling riser pull-in on the Dunlin Alpha platform
- BP Clair fibre optic installation
- Electrical umbilical pull-in for Callater Field development
- Undertaking preventative winch maintenance for Ensco
- JFO provides bespoke solutions on complex project off the Ivory Coast
- James Fisher Offshore supports Subsea 7 in Gorgon project
- Recovery and reinstallation of Ocean Installer mooring lines
- Nemo Link UXO Investigation
- Lancaster EPS Project
- TechnipFMC Enquest Kraken
- TechnipFMC/Repsol IRM
- Subsea 7 BP Atoll
- Cutting, dredging and recovery demonstration
- Premier Oil Balmoral Abex - Decommissioning
- Safaniya Demolition works
- DeepOcean Ghana, TEN project
- Abrasive Water Jet Cutting Case Study
- Safaniya Jacket Removal
- Seven Kestrel IRM
- Bokor Phase III Redevelopment
- Linear Winch Case Study
- Talos Bulleit
- Well severance UKCS
- *Update* Safaniya Jacket Removal
- Sapura / Chevron Thailand jacket and pipeline removal
- CFE Q1 2021 update
- JFO Life of Field - Riser installation UKCS
- Life of Field update Q2 2021
- Controlled Flow Excavation services for Renewables
- Multistring Conductor Cut and Recovery
- Pipeline cut and recovery, Arabian Gulf
- Jacket Removal, Safaniya, KSA
- Slipover jacket removal from James Fisher Decommissioning
- USA Offshore Wind Farms
- Abrasive cutting trial at National Hyperbaric Centre Aberdeen
- Shore Pull Kingdom of Saudi Arabia
- James Fisher Decommissioning - Gyda jacket decommissioning
- Jacket repair case study
- Installation of flexible risers case study
Life of Field Q2 2021
Repsol Scapa - Lay Spread Support Services
James Fisher Offshore (JFO), in partnership with Aquatic Subsea supported our customer with subsea
and back deck equipment requirements on the BOKA Atlantis DSV for works on the Claymore Field.
The aim of the project was to safeguard field production from the current three operating wells, and in addition re-start production from another well. Full scope of work included the install of 80m wire to pull-out old flexi within the J-tube. This required subsea support utilising JFO’s BFG15 subsea winch and our hydraulic cutter for cut of the flexi as close to the seabed as possible. The topside package then assisted the installation of the replacement flexi, whilst the old flexi was then cut on deck into 6m lengths for onshore recycling.
Following the last minute call off for an air winch to support an earlier project, JFO were able to pull
forward the grillage, change out the wire rope and arrange for a technician to commission and function
test the equipment on the deck of the vessel.
Download the Repsol Scapa Case Study (404 KB)
Buzzard Field Development Phase II
The Buzzard platform is the largest UK North Sea oil discovery in the past two decades and Buzzard Phase II (BPII) is a subsea development of the Buzzard northern area. The objective of this project is to safely develop additional reserves and bring new production on stream, supporting the goal of maximizing economic recovery in the North Sea.
BPII is a bid to go after additional reserves to the north of the main field with a subsea development tied-back to it, with peak production of 37,000 boepd.
As part of this project, JFO supported umbilical pull-in utilising its 37Te hydraulic winch package and provided full technical support throughout, to overcome wire routing challenges on the platform.
Download case study for Buzzard Field Development Phase II (400 KB)