- Services
- Decommissioning
- Well Abandonment
- Life of Field
- Controlled Flow Excavation
- Project management
- Worldwide partnerships
- Bespoke engineering
- Equipment overhaul and recertification
- Offshore technicians
- JFS complementary services
- Equipment
- Subsea tooling
- Winches
- Marine cranes
- Fluid solutions
- Associated deck equipment
- Controlled Flow Excavation Tools
- Ingersoll Rand
- Man riding winches
- Utility winches
- Hoists
- BOP handling systems
- OEM spare parts
- Ingersoll Rand service centre
- Ingersoll Rand power tools
- About
- Our Values
- Careers
- Apprenticeships
- Global locations
- QHSE (Quality, Health, Safety and Environment)
- Cutting equipment
- Recovery equipment
- Coating removal equipment
- Subsea pumps
- Subsea ancillary equipment
- Torquing and bolting
- Spare parts and consumables
- Subsea drills
- Subsea cleaning powertools
- Subsea breakers
- Positive displacement pumps/HT400
- Centrifugal pumps
- Jetting pumps
- Umbilical reelers and associated equipment
- Air compressors
- Fairleads
- Hydraulic power units (HPUs)
- Launch and recovery systems (LARS) / A-frames
- Overboarding sheaves
- Hot wash unit
- James Fisher and NMDC Group sign strategic agreement
- Supporting our local community
- Energy Voice - James Fisher Decommissioning
- James Fisher to address needs of expanding decommissioning market with launch of dedicated business line
- Archive
- Supplying pumping equipment to raise the Costa Concordia
- Equipment spreads for Hess South Arne and IVRR
- Supporting Fugro Subsea Services Ltd. with equipment deployment in the North Sea
- Mobilising hydraulic winch package for Technip
- Taqa Harding DSV campaigns
- Dredging for Subsea 7 in the North Sea
- Full back deck provision for Technip IRM campaign
- Subsea 7 - BP West Nile Delta gas development
- Subsea umbilical removal for the Judy platform
- Supporting Bibby Subsea with IRM works
- Pull-in winch package for Technip/Chevron Bangka project
- Supplying hydraulic winch packages for Quad 204 FPSO project
- Installing and commissioning FPSO winch package alongside Bibby Offshore
- Provision of deck and subsea equipment for Hibernia Southern Extension project
- Gryphon Alpha FPSO winch and line monitoring package
- Enabling riser pull-in on the Dunlin Alpha platform
- BP Clair fibre optic installation
- Electrical umbilical pull-in for Callater Field development
- Undertaking preventative winch maintenance for Ensco
- JFO provides bespoke solutions on complex project off the Ivory Coast
- James Fisher Offshore supports Subsea 7 in Gorgon project
- Recovery and reinstallation of Ocean Installer mooring lines
- Nemo Link UXO Investigation
- Lancaster EPS Project
- TechnipFMC Enquest Kraken
- TechnipFMC/Repsol IRM
- Subsea 7 BP Atoll
- Cutting, dredging and recovery demonstration
- Premier Oil Balmoral Abex - Decommissioning
- Safaniya Demolition works
- DeepOcean Ghana, TEN project
- Abrasive Water Jet Cutting Case Study
- Safaniya Jacket Removal
- Seven Kestrel IRM
- Bokor Phase III Redevelopment
- Linear Winch Case Study
- Talos Bulleit
- Well severance UKCS
- *Update* Safaniya Jacket Removal
- Sapura / Chevron Thailand jacket and pipeline removal
- CFE Q1 2021 update
- JFO Life of Field - Riser installation UKCS
- Life of Field update Q2 2021
- Controlled Flow Excavation services for Renewables
- Multistring Conductor Cut and Recovery
- Pipeline cut and recovery, Arabian Gulf
- Jacket Removal, Safaniya, KSA
- Slipover jacket removal from James Fisher Decommissioning
- USA Offshore Wind Farms
- Abrasive cutting trial at National Hyperbaric Centre Aberdeen
- Shore Pull Kingdom of Saudi Arabia
- James Fisher Decommissioning - Gyda jacket decommissioning
- Jacket repair case study
- Installation of flexible risers case study
Lancaster EPS Project - Boulder Clearance Campaign
Scope of Works:
The Lancaster field is a new development involving the tie-back of two production wells to a FPSO. James Fisher Offshore (JFO) supported our customer with a spread of subsea boulder clearance equipment. As the project deadline was tight and to also provide contingency, should it be required, JFO utilised a Dual Supply system involving topside and ROV hydraulic oil supply. This was made possible with the use of hot stab sets on the tools and also on both the downlines and ROV. In the event that topside oil supply was compromised, a ROV equipped with a Zero Leak Hot Stab system could intervene and continue with operations, whilst the topside supply is rectified. A contingency, which was never required but provided a solution in the event of breakdown related downtime.
Scope of Supply:
- 15Te Orange Peel Grab and shipping/storage corral
- 10Te Orange Peel Grab and shipping/storage corral
- 1.6Te Clamshell Grab and shipping/storage corral
- Twin 37kW Electric HPU
- Hydraulic Umbilical Reel c/w 200mtr downlines and remote control
- BFG10 Hydraulic Winch (set at 3Te top layer) and wire rope
- 3No. Zero Leak Hydraulic Hot Stab systems
During the 37 day campaign more than 7000 boulders were cleared with the assistance of two JFO Technicians with Rigger level 1 training. The flexibility of JFO Technicians allows them to integrate seamlessly into the deck crew and provide experience with JFO equipment.
Following issues with customer power supply on-board the vessel, JFO out of hours service delivered a generator package to the vessel mobilisation on a Saturday evening. The ability to react quickly to the situation is thanks to our dedicated onshore personnel who will always strive to help customers whatever the time or issue.
Download 'Lancaster EPS Project - Boulder Clearance Campaign' case study