- Services
- Decommissioning
- Well Abandonment
- Life of Field
- Controlled Flow Excavation
- Project management
- Worldwide partnerships
- Bespoke engineering
- Equipment overhaul and recertification
- Offshore technicians
- JFS complementary services
- Equipment
- Subsea tooling
- Winches
- Marine cranes
- Fluid solutions
- Associated deck equipment
- Controlled Flow Excavation Tools
- Ingersoll Rand
- Man riding winches
- Utility winches
- Hoists
- BOP handling systems
- OEM spare parts
- Ingersoll Rand service centre
- Ingersoll Rand power tools
- About
- Our Values
- Careers
- Apprenticeships
- Global locations
- QHSE (Quality, Health, Safety and Environment)
- Cutting equipment
- Recovery equipment
- Coating removal equipment
- Subsea pumps
- Subsea ancillary equipment
- Torquing and bolting
- Spare parts and consumables
- Subsea drills
- Subsea cleaning powertools
- Subsea breakers
- Positive displacement pumps/HT400
- Centrifugal pumps
- Jetting pumps
- Umbilical reelers and associated equipment
- Air compressors
- Fairleads
- Hydraulic power units (HPUs)
- Launch and recovery systems (LARS) / A-frames
- Overboarding sheaves
- Hot wash unit
- Darren Chapman is promoted to operations manager
- We are pleased to announce two new promotions within James Fisher Offshore
- James Fisher and NMDC Group sign strategic agreement
- Supporting our local community
- Archive
- Supplying pumping equipment to raise the Costa Concordia
- Equipment spreads for Hess South Arne and IVRR
- Supporting Fugro Subsea Services Ltd. with equipment deployment in the North Sea
- Mobilising hydraulic winch package for Technip
- Taqa Harding DSV campaigns
- Dredging for Subsea 7 in the North Sea
- Full back deck provision for Technip IRM campaign
- Subsea 7 - BP West Nile Delta gas development
- Subsea umbilical removal for the Judy platform
- Supporting Bibby Subsea with IRM works
- Pull-in winch package for Technip/Chevron Bangka project
- Supplying hydraulic winch packages for Quad 204 FPSO project
- Installing and commissioning FPSO winch package alongside Bibby Offshore
- Provision of deck and subsea equipment for Hibernia Southern Extension project
- Gryphon Alpha FPSO winch and line monitoring package
- Enabling riser pull-in on the Dunlin Alpha platform
- BP Clair fibre optic installation
- Electrical umbilical pull-in for Callater Field development
- Undertaking preventative winch maintenance for Ensco
- JFO provides bespoke solutions on complex project off the Ivory Coast
- James Fisher Offshore supports Subsea 7 in Gorgon project
- Recovery and reinstallation of Ocean Installer mooring lines
- Nemo Link UXO Investigation
- Lancaster EPS Project
- TechnipFMC Enquest Kraken
- TechnipFMC/Repsol IRM
- Subsea 7 BP Atoll
- Cutting, dredging and recovery demonstration
- Premier Oil Balmoral Abex - Decommissioning
- Safaniya Demolition works
- DeepOcean Ghana, TEN project
- Abrasive Water Jet Cutting Case Study
- Safaniya Jacket Removal
- Seven Kestrel IRM
- Bokor Phase III Redevelopment
- Linear Winch Case Study
- Talos Bulleit
- Well severance UKCS
- *Update* Safaniya Jacket Removal
- Sapura / Chevron Thailand jacket and pipeline removal
- CFE Q1 2021 update
- JFO Life of Field - Riser installation UKCS
- Life of Field update Q2 2021
- Controlled Flow Excavation services for Renewables
- Multistring Conductor Cut and Recovery
- Pipeline cut and recovery, Arabian Gulf
- Jacket Removal, Safaniya, KSA
- Slipover jacket removal from James Fisher Decommissioning
- USA Offshore Wind Farms
- Abrasive cutting trial at National Hyperbaric Centre Aberdeen
- Shore Pull Kingdom of Saudi Arabia
- James Fisher Decommissioning - Gyda jacket decommissioning
- Jacket repair case study
- Installation of flexible risers case study
Installing and commissioning FPSO winch package alongside Bibby Offshore
Scope of works:
Bibby Offshore was awarded the contract for the provision of subsea installation services by E.ON for the development of the Huntington field to tie-back to a new Sevan Voyageur Spirit floating production storage and offloading vessel (FPSO).
James Fisher Offshore (JFO) were subcontracted to work alongside Bibby Offshore to deliver the following scope of work between the Huntington manifold and FPSO:
- Installation of four risers (8” pressure and water injection risers and 4” gas lift risers) and a control/chemical injection dynamic umbilical
- Tie-in of the risers and dynamic umbilical to the associated static facilities on the seabed
- Installation of the “drop down” tie-in spools between the xmas trees and the drilling template pipework
- Connection of the pre-installed control jumpers to the xmas trees within the drilling template
Scope of supply:
JFO were engaged in the early phases of the engineering development process in order to successfully deliver this project.
The equipment package supplied included:
- 1 x 70Te hydraulic winch complete with non-rotational wire rope
- 1 x diesel driven hydraulic power unit (HPU)
- 9 x 60Te vertical deck sheaves
- 4 x 60Te horizontal deck sheaves
- 1 x running line monitor system
JFO's project team were involved in the riser pull-in structural analysis, pull-in load requirement calculations, multi-sheave system friction loss calculations, wire rope characteristics, wire re-routing methodology and grillage design.
Our experienced offshore technicians installed and commissioned the winch package on the Sevan Voyageur Spirit FPSO in Norway, then provided 24 hour coverage for the operational pull-in activities as part of the FPSO hook up.
Download the 'Installing and commissioning FPSO winch package alongside Bibby Offshore' case study.