- Services
- Decommissioning
- Well Abandonment
- Life of Field
- Controlled Flow Excavation
- Project management
- Worldwide partnerships
- Bespoke engineering
- Equipment overhaul and recertification
- Offshore technicians
- JFS complementary services
- Equipment
- Subsea tooling
- Winches
- Marine cranes
- Fluid solutions
- Associated deck equipment
- Controlled Flow Excavation Tools
- Ingersoll Rand
- Man riding winches
- Utility winches
- Hoists
- BOP handling systems
- OEM spare parts
- Ingersoll Rand service centre
- Ingersoll Rand power tools
- About
- Our Values
- Careers
- Apprenticeships
- Global locations
- QHSE (Quality, Health, Safety and Environment)
- Cutting equipment
- Recovery equipment
- Coating removal equipment
- Subsea pumps
- Subsea ancillary equipment
- Torquing and bolting
- Spare parts and consumables
- Subsea drills
- Subsea cleaning powertools
- Subsea breakers
- Positive displacement pumps/HT400
- Centrifugal pumps
- Jetting pumps
- Umbilical reelers and associated equipment
- Air compressors
- Fairleads
- Hydraulic power units (HPUs)
- Launch and recovery systems (LARS) / A-frames
- Overboarding sheaves
- Hot wash unit
- James Fisher and NMDC Group sign strategic agreement
- Supporting our local community
- Energy Voice - James Fisher Decommissioning
- James Fisher to address needs of expanding decommissioning market with launch of dedicated business line
- Archive
- Supplying pumping equipment to raise the Costa Concordia
- Equipment spreads for Hess South Arne and IVRR
- Supporting Fugro Subsea Services Ltd. with equipment deployment in the North Sea
- Mobilising hydraulic winch package for Technip
- Taqa Harding DSV campaigns
- Dredging for Subsea 7 in the North Sea
- Full back deck provision for Technip IRM campaign
- Subsea 7 - BP West Nile Delta gas development
- Subsea umbilical removal for the Judy platform
- Supporting Bibby Subsea with IRM works
- Pull-in winch package for Technip/Chevron Bangka project
- Supplying hydraulic winch packages for Quad 204 FPSO project
- Installing and commissioning FPSO winch package alongside Bibby Offshore
- Provision of deck and subsea equipment for Hibernia Southern Extension project
- Gryphon Alpha FPSO winch and line monitoring package
- Enabling riser pull-in on the Dunlin Alpha platform
- BP Clair fibre optic installation
- Electrical umbilical pull-in for Callater Field development
- Undertaking preventative winch maintenance for Ensco
- JFO provides bespoke solutions on complex project off the Ivory Coast
- James Fisher Offshore supports Subsea 7 in Gorgon project
- Recovery and reinstallation of Ocean Installer mooring lines
- Nemo Link UXO Investigation
- Lancaster EPS Project
- TechnipFMC Enquest Kraken
- TechnipFMC/Repsol IRM
- Subsea 7 BP Atoll
- Cutting, dredging and recovery demonstration
- Premier Oil Balmoral Abex - Decommissioning
- Safaniya Demolition works
- DeepOcean Ghana, TEN project
- Abrasive Water Jet Cutting Case Study
- Safaniya Jacket Removal
- Seven Kestrel IRM
- Bokor Phase III Redevelopment
- Linear Winch Case Study
- Talos Bulleit
- Well severance UKCS
- *Update* Safaniya Jacket Removal
- Sapura / Chevron Thailand jacket and pipeline removal
- CFE Q1 2021 update
- JFO Life of Field - Riser installation UKCS
- Life of Field update Q2 2021
- Controlled Flow Excavation services for Renewables
- Multistring Conductor Cut and Recovery
- Pipeline cut and recovery, Arabian Gulf
- Jacket Removal, Safaniya, KSA
- Slipover jacket removal from James Fisher Decommissioning
- USA Offshore Wind Farms
- Abrasive cutting trial at National Hyperbaric Centre Aberdeen
- Shore Pull Kingdom of Saudi Arabia
- James Fisher Decommissioning - Gyda jacket decommissioning
- Jacket repair case study
- Installation of flexible risers case study
Electrical umbilical pull-in for Callater Field development
Scope of works:
James Fisher Offshore (JFO) carried out the successful pull-in of a new electrical umbilical as part of the Callater Field development.
JFO’s hydraulic winch wire was connected to a Subsea 7 DSV where it was attached to the umbilical pull-in head. The DSV winch then deployed the umbilical subsea and, in conjunction with the JFO platform-mounted winch, the umbilical was pulled up the riser to the topside umbilical hang off point.
Scope of supply:
JFO supplied an 8Te hydraulic winch package suitable for zone 2 hazardous area environment. Equipment supply also included load monitoring equipment for the pull-in operations and the offshore winch system test, several horizontal and vertical deck sheaves and rigging to route the winch wire from the Beryl Alpha riser access tower down to the seabed via a riser.
JFO developed the method statement for the winch system offshore test and this was conducted by the JFO offshore team in advance of the DSV arriving in field.
The JFO offshore team boast a wealth of experience and have hydraulics accreditation, Banksman Slinger and OPITO Rigging certification, Wire Rope Examiner and socketing certification, Risk and Impact Assessment, Hazard Identification and Risk Control certification. The end client, Apache lifting interface coordinator, commented;
“The team were very proactive and their experience in the task and equipment was second to none. Great work.”
Download 'Electrical umbilical pull-in for Callater Field development' case study.