Case study archive

Grid view

31/05/2018
Premier Oil Balmoral Abex - Decommissioning

JFO were pivotal to the successful cutting and removal of a subsea wellhead protection structure

05/02/2018
Cutting, dredging and recovery demonstration

Demonstration to showcase our equipment and services

28/09/2017
TechnipFMC/Repsol IRM

James Fisher Offshore packaged and delivered equipment spreads for 3 vessels with a combined operational time of 225 days

22/09/2017
Lancaster EPS Project

James Fisher Offshore supplied boulder clearance equipment for the Lancaster EPS Project.

17/07/2017
Subsea 7 BP Atoll

10/05/2017
Electrical umbilical pull-in for Callater Field development

JFO team commended for proactiveness and experience during offshore winch system test.

10/05/2017
BP Clair fibre optic installation

JFO carries out the installation of fibre optic cables through the Clair ridge platform j-tube.

10/05/2017
Provision of deck and subsea equipment for Hibernia Southern Extension project

JFO supply Technip with a diverse range of deck and subsea equipment for use in the Hibernia field, offshore Canada.

20/04/2017
Nemo Link UXO Investigation

Nemo Link UXO Investigation
BACK TO TOP